Steps to Successful Construction Project

Reference Number: MTAS-802
Reviewed Date: 05/12/2023

The material presented in the following sections is intended to be a guide in the process of administering a public construction project. There are six critical areas where the owner (administrative board) must take responsibility:

  1. Defining the construction project;
  2. Procuring professional assistance;
  3. Procuring financial resources;
  4. Setting performance standards;
  5. Administering the project; and
  6. Monitoring the project.