Legal Documents of Mosheim

Code of Mosheim

Mosheim
Title 18 : Water and Sewers
Chapter 2 : General Wastewater Regulations

18-261 : Inspection of lines.

The sewer laterals from the building to the sewer main line must be inspected by an inspector of the Town of Mosheim before any underground portion is covered. The town is to be contacted twenty-four (24) hours ahead of anticipated time of required inspection. (Ord. #221, April 2010)