Legal Documents of Mosheim
Code of Mosheim
Title 18 Water and Sewers
Chapter 2 General Wastewater Regulations
18-219 : Individual wastewater discharge permitting: new connections.
All new nonresidential customers who desire to connect to the Lick Creek Valley Sanitary Sewer System must submit an application on form furnished by the Town of Mosheim. Based on the application information (and other applicable information), the Town of Mosheim will determine if an individual discharge permit for discharge is required. The application is to be submitted at least sixty (60) days prior to discharge.
Any nonresidential user who is determined to be a "significant industrial user" is required to obtain an individual wastewater discharge permit who proposed to begin or recommence discharging into the POTW must obtain such permit prior to the beginning or recommencing of such discharge. An application for this individual wastewater discharge permit, in accordance with § 18-220, must be filed at least sixty (60) days prior to the date upon which any discharge will begin or recommence. Any user determined to be a "non-significant categorical industrial user" may be required to submit periodic reports but may not be issued an "individual wastewater discharge permit" per § 18-204(36). (Ord. #221, April 2010)