Legal Documents of Mosheim

Code of Mosheim

Table of Contents » Title 18 Water and Sewers » Chapter 2 General Wastewater Regulations » § 18-217 Individual wastewater discharge permit requirement.
Mosheim
Title 18 : Water and Sewers
Chapter 2 : General Wastewater Regulations

18-217 : Individual wastewater discharge permit requirement.

  1. No significant industrial user shall discharge wastewater into the POTW without first obtaining an individual wastewater discharge permit from the mayor, except that a significant industrial user that has filed a timely application pursuant to § 18-218 may continue to discharge for the time period specified therein.
  2. The mayor may require other users to obtain individual wastewater discharge permits as necessary to carry out the purposes of this chapter.
  3. Any violation of the terms and conditions of an individual wastewater discharge permit shall be deemed a violation of this chapter and subjects the wastewater discharge permittee to the sanctions set out in §§ 18-247 through 18-254 and §§ 18-259 through 18-267. Obtaining an individual wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. (Ord. #221, April 2010)