Legal Documents of Mosheim
Code of Mosheim
Title 18 Water and Sewers
Chapter 1 Water And Sewer System Administration
18-106 : Water and sewer main extensions.[3]
Persons desiring water and/or sewer main extensions must pay all of the cost of making such extensions.
All such extensions shall be installed either by town forces or by other forces working directly under the supervision of the town in accordance with plans and specifications prepared by an engineer registered with the State of Tennessee.
Upon completion of such extensions and their approval by the town, such water and/or sewer mains shall become the property of the town. The persons paying the cost of constructing such mains shall execute any written instruments requested by the town to provide evidence of the town's title to such mains. In consideration of such mains being transferred to it, the town shall incorporate said mains as an integral part of the municipal water and sewer systems and shall furnish water and sewer service therefrom in accordance with these rules and regulations, subject always to such limitations as may exist because of the size and elevation of the mains.
Construction of building sewers: title 18, chapter 2.