  1. The connection of the building sewer into the public sewer shall conform to the requirements of the Standard Plumbing Code or other applicable rules and regulations of the city, or the procedures set forth in the appropriate specifications of the A.S.T.M. and the W.P.F.C. Manual of Practice, No. 9. All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved in writing by the superintendent before installation.
  2. An applicant obtaining a permit to connect to the city sewer shall supply information, plans, and specifications as shall be required by the superintendent. The installation of said building sewer must be made in the manner as finally approved by the superintendent.
  3. A permit for connection to the city sewer system is issued conditionally, and shall not become effective until the installation of the building sewer required to connect the applicant's property to the sewer system is completed to the satisfaction of the superintendent. He shall be allowed to inspect the work at any stage of construction. The applicant for the permit shall notify the superintendent when the work is ready for final inspection and before any underground portions are covered. Twenty-four (24) hours notice shall be given said superintendent and his inspection shall be made within that time. The connection to the city sewer shall be made either by the superintendent, or persons approved by him. Where connection to a city sewer has been made without a permit and/or approved inspection, then it shall be the right and duty of said superintendent to uncover said connection for inspection and reconnection if same is not proper. The costs of doing so shall be assessed against the landowner, user, and/or permittee, when one exists, and constitute a lien against said property. In addition to the above remedy, the city reserves the right to proceed under § 18-245, upon written notice from the superintendent to the user and/or applicant that the above conditions have been violated.

    Every permit issued under this act is subject to revocation, if in the opinion of the superintendent, the installation of the user's building sewer and/or sewer tap connection do not meet the requirements of this code, or plans and specifications agreed to at the time the permit was issued. In that event, a stop work order will be issued by the superintendent and work will not be resumed until a new permit is issued. (1976 Code, § 13-214)

Date Last Updated: 03/23/2022
Codification Date: 03/01/2000

Officials at Date of Last Codification:

Mayor - Mike Werner

Vice Mayor - Mark McCown

Commissioner - Ryan DeSear

Commissioner - Chad Reagan

Commissioner - Kirby Smith

City Manager - Cindy Cameron Ogle

City Attorney - Ronald E. Sharp