16-203 : Fee.
At the time an applicant secures an excavation permit, he shall pay to the recorder a fee for resurfacing the affected street area, and in addition, a fee for those instances in which the city shall be required to refill the excavation, to wit:
- $0.05 per cubic foot of refilling,
- .75 per square foot of concrete paving,
- .50 per square foot of sidewalk paving,
- .35 per square foot of oil macadam paving,
- .25 per square foot of loose rock macadam paving,
- 1.00 per square foot of concrete base asphalt surface paving,
- 3.00 minimum fee. (1976 Code, § 12-103)
Date Last Updated: 03/23/2022
Codification Date: 03/01/2000
Officials at Date of Last Codification:
Mayor - Mike Werner
Vice Mayor - Mark McCown
Commissioner - Ryan DeSear
Commissioner - Chad Reagan
Commissioner - Kirby Smith
City Manager - Cindy Cameron Ogle
City Attorney - Ronald E. Sharp