Legal Documents of Gatlinburg
Code of Gatlinburg
Generating PDF...
Code of Gatlinburg
Title 12 Building, Utility, etc. Codes
Chapter 6 Excavation, Grading, And Clearing Code
Title 12 Building, Utility, etc. Codes
Chapter 6 Excavation, Grading, And Clearing Code
Gatlinburg
Title 12 : Building, Utility, etc. Codes
Chapter 6 : Excavation, Grading, And Clearing Code
12-606 : Application.
To obtain a permit, the applicant shall first file an application therefore in writing on a form furnished by the City of Gatlinburg for that purpose. Every application shall:
- Identify and describe the work to be covered by the permit for which application is made.
- Describe the land on which the proposed work is to be done, by lot, block, tract, and house and street address, or similar description that will readily identify and definitely locate the proposed building or work;
- Be accompanied by plans and specifications as required in § 12-607 of this code. These plans and specifications shall depict the entire boundary of said property and shall show areas of proposed development, land disturbances and areas which are not to be disturbed.
- Give other information as reasonably required by the building official. (1976 Code, § 4-604, as replaced by Ord. #2209, June 2000)
Date Last Updated: 03/23/2022
Codification Date: 03/01/2000
Officials at Date of Last Codification:
Mayor - Mike Werner
Vice Mayor - Mark McCown
Commissioner - Ryan DeSear
Commissioner - Chad Reagan
Commissioner - Kirby Smith
City Manager - Cindy Cameron Ogle
City Attorney - Ronald E. Sharp