Legal Documents of Gatlinburg

Code of Gatlinburg

Gatlinburg
Title 12 : Building, Utility, etc. Codes
Chapter 6 : Excavation, Grading, And Clearing Code

12-606 : Application.

To obtain a permit, the applicant shall first file an application therefore in writing on a form furnished by the City of Gatlinburg for that purpose. Every application shall:

  1. Identify and describe the work to be covered by the permit for which application is made.
  2. Describe the land on which the proposed work is to be done, by lot, block, tract, and house and street address, or similar description that will readily identify and definitely locate the proposed building or work;
  3. Be accompanied by plans and specifications as required in § 12-607 of this code. These plans and specifications shall depict the entire boundary of said property and shall show areas of proposed development, land disturbances and areas which are not to be disturbed.
  4. Give other information as reasonably required by the building official. (1976 Code, § 4-604, as replaced by Ord. #2209, June 2000)
Date Last Updated: 03/23/2022
Codification Date: 03/01/2000

Officials at Date of Last Codification:

Mayor - Mike Werner

Vice Mayor - Mark McCown

Commissioner - Ryan DeSear

Commissioner - Chad Reagan

Commissioner - Kirby Smith

City Manager - Cindy Cameron Ogle

City Attorney - Ronald E. Sharp