18-209 : Correction of violations.

  1. Any person found to have cross-connections, auxiliary intakes, bypasses or interconnections in violation of the provisions of this chapter shall be allowed a reasonable time within which to comply with the provisions of this chapter. After a thorough investigation of the existing conditions and an appraisal of the time required to complete the work, the manager or his representative shall assign an appropriate amount of time, but in no case shall the time for corrective measures exceed ninety (90) days.
  2. Where cross-connections, auxiliary intakes, bypasses or interconnections are found that constitute an extreme hazard, with the immediate possibility of contaminating the public water system, the Dandridge Water Management Facility shall require that immediate corrective action be taken to eliminate the threat to the public water system. Expeditious steps shall be taken to disconnect the public water system from the on-site piping system unless the imminent hazard is immediately corrected, subject to the right to a due process hearing upon timely request. The time allowed for preparation for a due process hearing shall be relative to the risk of hazard to the public health and may follow disconnection when the risk to the public health and safety, in the opinion of the manager, warrants disconnection prior to a due process hearing.
  3. The failure to correct conditions threatening the safety of the public water system as prohibited by this chapter and Tennessee Code Annotated, § 68-221-711, within the time limits established by the manager or his representative, shall be grounds for denial of water service. If proper protection has not been provided after a reasonable time, the manager shall give the customer notification that water service is to be discontinued, and shall physically separate the public water system from the customer's on-site piping in such a manner that the two systems cannot again be connected by an unauthorized person, subject to the right of a due process hearing upon timely request. The due process hearing may follow disconnection when the risk to the public health and safety, in the opinion of the manager, warrants disconnection prior to a due process hearing. (Ord. #09/10-19, July 2010)
Date Last Updated: 09/10/2019
Codification Date: 06/01/2019

Officials at Date of Last Codification:

Mayor - George Gantte 
Vice Mayor - Todd Kesterson 
Aldermen - Mike Chambers 
Aldermen - Jeffrey Depew 
Aldermen - Jessie Elder 
Aldermen - Mike Nelson 
Aldermen - Marianne Reese 
Town Recorder - Cathy Dixon