Legal Documents of Bean Station
Code of Bean Station
Title 18 Water and Sewers
Chapter 3 Industrial/Commercial Wastewater Regulations
18-302 : Discharge permits.
Application for discharge of commercial or industrial wastewater. All users or prospective users which generate commercial or industrial wastewater shall make application to the superintendent for connection to the municipal wastewater treatment system and shall comply with all provisions of the MUC polices adopted herein. Applications shall be required
from all new dischargers as well as, for any existing discharger desiring additional service or where there is a planned change in the industrial or wastewater treatment process. Connection to the town sewer or changes in the industrial process or wastewater treatment process shall not be made until the application is received and approved by the superintendent or the MUC Pretreatment Coordinator, the building sewer is installed in accordance with § 18-206 of this ordinance and an inspection has been performed by the superintendent or his representative.
The receipt by the town of a prospective customer's application for connection shall not obligate the town to render the connection. If the service applied for cannot be supplied in accordance with this chapter and the town's rules and regulations and general practice, the connection charge will be refunded in full, and there shall be no liability of the town to the applicant for such service. (as added by Ord. #03-01-23, April 2023 Ch1_05-28-24)
Officials at Date of Last Codification:
Mayor - Ben Waller
Aldermen - Mickey Ankrom
Aldermen - Jeff Atkins
Aldermen - Eddie Douglas
Aldermen - Patsy Winstead Harrell
Recorder - Robin Jarnigan